rahmansyafrudin3534
About Candidate
Location
Education
Work & Experience
I work at PT. MCCI as an Electrical Technician for about 10 years.My duties & responsibilities included : maintenance and troubleshooting all electrical facilities problems.*)Job description ▪ Maintenance and troubleshooting all Electrical Facilities at building and plant. ▪ Included start-up and shutdown plant. ▪ Keep stable operation plant and minimizes breakdown plant with the company health acceptable. keep safety and environmental guidelines as well as safety procedures,standard operating procedures and regulations company.*) Responsibilities. Maintenance and troubleshooting all electrical facilities problems such as : • Assembly/Dissambly of Induction motors, Cyclo and Beier Cyclo. • Protection relay test. • Electrical Installation LV/MV. • Building electricity installation. • Local control panel system. • Switchgear test. • electrical panel installation. • Grounding system. • Lightning protection system. • Computer Literate (MS Office,Powerpoint, Excel, wordpro,Visio). • Variable speed motor. • Submersible pump. • Lighting System • Emergency Diesel Generator. • Hoist Crane. • Cathodic protection. • Electrical Chlorinator. • DC and Panel DC motor motors. • Motor Control Center. • UPS and Battery system, Etc.
I work at PT Mitsubishi Chemical Indonesia for about 12 years as Production Operator at utility area. My duties and responsibilities were to keep normal operations and troubleshooting with all factory facilities problems.*)Job description ▪ Factory operation and Field monitoring and DCS. ▪ Included start-up and shutdown plant. ▪ Keep Quality and Production always Good also minimizes shutdown with the company health Acceptable, safety and environmental guidelines as well as safety procedures,standard operating procedures and regulations company.*) Responsibilities Operate & control : • DCS (Distributed Control System) Centum XL & Centum CS-3000. • Desalinator & Demineralizers. • Diesel Generators & Steam Turbines. • Air plants. • Water instruments. • Steam & Electricity. • Boilers. • Incinerators. • Waste Water Systems (Aerobic & Anaerobic). • Rotary Machine Tools: Compressors, Blowers, Pumps, Decanters, Agitators, Conveyors, Flight Conveyors. • Pipelines. • Control Valves. • Pressure Gauges. • Thermo Gauges. • Flow meters. • Transmitters. • Filters and Strainers. • Pressure Safety Valves, etc.
I worked at PT.Pratama Langgeng Maju Bersama as a Semi Skill Fitter for 2 months. My duties and responsibilities include: Preparing and arranging the necessary equipment and materials and cutting and connecting pipes according to the Isomatric Drawing.*) Job Description : 1. Preparing work equipment : Welding machine, cutting torch, grinder, meter, waterpas, elbow, Chainblock and others. 2. Arranging materials : Loading pipes according to needs including supporting accessories such as: flanges, reducers, tees and others. 3. Marking and cutting : Measuring and cutting pipes according to needs. 4. Connecting pipes : Adjusting pipes according to the procedures in the isometric drawing.
I worked at PT.Gurmyong Indonesia as Fitter 2 for 5 months. My duties and responsibilities include : Preparing and arranging the necessary equipment and materials and cutting and connecting pipes according to Isomatric Drawing.*) Job Description : 1. Studying working drawings (Isometric drawing) : Receiving work from piping foreman through working drawings or isometric pipe drawings. After that they will study and observe the details of the pipe installation design according to the drawing, both isometric and keyplan/layout, if necessary. 2. Preparing work equipment : Welding machine, cutting torch, grinder, meter, waterpas, elbow, Chainblock and others. 3. Arranging materials : Loading pipes according to needs including supporting accessories such as: flanges, reducers, tees and others. 4. Marking and cutting : Measuring and cutting pipes according to needs. 5. Pipe connection : Pipe adjustment according to the procedures in the isometric drawing 6. Finishing : Conducting analysis and tidying up the results of previous work such as grinding, cleaning, and everything related to the suitability and straightness of the pipe connection results.
I worked at PT.Grama Bezita as Fitter 1 for 1 month. My duties and responsibilities include: Preparing and arranging the necessary equipment and materials and cutting and connecting pipes according to Isomatric Drawing.*) Job Description : 1. Studying working drawings (Isometric drawing) : Receiving work from piping foreman through working drawings or isometric pipe drawings. After that they will study and observe the details of the pipe installation design according to the drawing, both isometric and keyplan/layout, if necessary. 2. Preparing work equipment : Welding machine, cutting torch, grinder, meter, waterpas, elbow, Chainblock and others. 3. Arranging materials : Loading pipes according to needs including supporting accessories such as: flanges, reducers, tees and others. 4. Marking and cutting : Measuring and cutting pipes according to needs. 5. Connecting pipes : Adjusting pipes according to the procedures in the isometric drawing 6. Welding : doing welding properly. Includes the selection of the right welding materials, the use of the correct welding tools, and an understanding of safe welding techniques. 7. Finishing : Conducting analysis and tidying up the results of previous work such as grinding, cleaning, and everything related to the suitability and straightness of the pipe connection results.
PT.Lurch Sira Indonesia - Local Operator WTP & WWTP at Cirebon 2 Coal Fired Power Plant Project. I work at PT.Lurch Sira Indonesia for about 1 year and 4 month as Local Operator at Water Treatment Plant area and Waste Water Treatment Plant area on Cirebon 2 Coal Fired Power Plant Project. My duties and responsibilities were to keep normal operations and troubleshooting with all factory facilities problems.*)Job description ▪ Factory operation and Field monitoring ▪ Included start-up and shutdown plant. ▪ Keep Quality and Production always Good also minimizes shutdown with the company health Acceptable, safety and environmental guidelines as well as safety procedures,standard operating procedures and regulations company.*) Responsibilities Operate & control : > WTP Area : • DAF Unit( Dissolved Air Flotation ) • UF Unit ( Ultra Filtration ) • SWRO Unit ( Sea Water Reversed Osmosis ) • BWRO Unit (Brackish Water Reversed Osmosis ) • EDI Unit ( Electro De Ionization )> WWTP Area : • Normal Pond . • Abnormal Pond. • DAF Sludge Pond. • UF Backwash Pond. • Effluent Pond. • Clarifier pond. • Oily Pond • PH Adjustment Tank and Cougulant Tank Unit • Clarifier • Thickener • SEWAGE Unit
PT.Lurch Sira Indonesia - Pre-Commisioning Operator WTP & WWTP at KINE Project JO - PT.Lotte Chemical Indonesia. I work at PT.Lurch Sira Indonesia as Pre-commissioning Operator at Water Treatment Plant area and Waste Water Treatment Plant area on KINE Project JO - PT.Lotte Chemical Indonesia for about 1 year 6 month until now.The main duties of a Pre-Commissioning are as follows: • Ensure that the Plant is ready for commissioning marked by the completion document. • Prepare the commissioning procedure. • Create and implement the Pre Start up Safety Review (PSSR). • Create a schedule and scenario / sequence commissioning (start up to performance test). • Implement the commissioning scenario and ensure it is according to schedule. • Troubleshoot if there is a process problem. • Monitor operational data / process data. • Make comparison between process data, and design data as a result of tool performance. • Make commissioning report to client until Operating Acceptance is achieved.